Completed kitchen at a LetsBuild home in Glenorie — sage green joinery with timber-edged handles, stone island with brass mixer, integrated ovens and styled open shelving

Kitchen renovations · Sydney

The room everyone lives in.

High-end kitchen renovations across Sydney — joinery, stone, appliances and services under one builder. The finish is decided at set-out, and the set-out is ours. Every photograph on this page is a completed LetsBuild kitchen.

What it actually is

A joinery project with services in it.

A kitchen is cabinetry built to the millimetre, with water, gas, drainage and heavy electrical running through it and stone sitting on top. Cabinet lines, stone joints and appliance reveals are decided at set-out — before anything is ordered — and that set-out is the difference between a kitchen that looks built-in and one that looks delivered.

Licence 297590c · HIA member 1220336 · licensed plumbing, gas & electrical trades · Sydney only

Our work · Glenorie

The kitchen behind the kitchen.

At our Glenorie build the front kitchen stays calm because the work happens behind it — a butler's pantry with its own sink and dishwasher, and a coffee station with the machine, the kettle and the drinks fridge off the main stage. These are photographs of finished LetsBuild work, not renders.

The Glenorie kitchen in afternoon light, seen across the oak dining table — island, brass tapware and sage joinery beyond

Glenorie · kitchen

Built for the table, not the brochure.

What moves the cost

Services first, stone second.

Two kitchens with the same benchtop can land tens of thousands apart. The spread is rarely the finishes — it is how far the water, gas and power move, and what the joinery is asked to hide. Five questions set a kitchen budget, long before anyone chooses a handle.

Layout

Keeping the sink and cooktop where they are is the biggest saving in the room

Services

Drainage falls, gas lines and ventilation runs — three licensed trades before joinery

Joinery

Integrated appliances and full-height cabinetry carry set-out time, not just material

Stone

Slab grade, joint placement and mitred edges — templated off cabinets, never drawings

Back of house

A butler's pantry is a second, smaller kitchen — plumbed, powered and stoned

No dollar figures here by design — a range that ignores your layout is a guess. A walkthrough prices the actual room.

How it runs

Quoted straight. Built in sequence.

Typical program six to twelve weeks depending on scope, one lead builder throughout, inclusions and exclusions on paper before strip-out. The quiet fortnight mid-project is the stone being templated and cut from the real cabinets — that pause is the joints landing where they should.

How a project runs

Questions

Approvals, trades and stone, mostly.

The same questions come up on every kitchen. Short answers below — the conditions are specific to your room and your lot, so confirm before you rely on them.

Do we need council approval to renovate a kitchen?

Usually not. Replacing joinery, benchtops, appliances and finishes within the existing room is generally exempt development under the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. Approval enters the picture when structural walls are opened, the room's footprint changes, or the kitchen is part of a larger alteration. The conditions are specific, so confirm your scope with your council or a registered certifier.

Who is allowed to move the gas, water and electrical?

Licensed trades only — in NSW plumbing and drainage work needs a licensed plumber, gasfitting a licensed gasfitter, and electrical work a licensed electrician, each issuing a certificate for their work. A kitchen renovation routinely touches all three, which is why it runs as a builder's project rather than a joinery delivery.

Why does moving the sink or the cooktop cost so much?

The sink drags drainage with it — falls that live in the slab or the floor structure, exactly as in a bathroom. The cooktop drags gas or a heavy electrical circuit, plus ventilation that has to reach outside air. Keeping the wet and hot points where they are is the single biggest cost decision in a kitchen; moving them is often worth it, but it should be a decision, not a surprise.

How long does a kitchen renovation take?

Typically six to twelve weeks depending on scope. The rhythm is fixed: strip-out, services rough-in, carcasses in, then stone is templated off the real cabinets and fabricated — usually a one to two week pause — then benchtops on, splashback, appliances and fit-off. Templating off drawings instead of cabinets is how joints end up in the wrong place.

Can we live at home while the kitchen is done?

Yes — almost everyone does. We set up a temporary kitchen with the fridge, the kettle and a bench somewhere sensible, and the water is off only for planned windows. The weeks without a proper stove are real; we tell you how many before the contract, not after.

Will you install a kitchen we bought elsewhere?

No. A kitchen succeeds or fails at set-out — cabinet lines, stone joints, appliance reveals, services landing where the joinery expects them. Our joiner builds to our set-out and our trades work to the same drawing, so one builder owns the result. Splitting supply from install is where the gaps come from.

Planning summary current at August 2026 · exempt development conditions are specific and vary by lot · confirm with your council or a registered certifier before relying on it

Start

Let's walk your kitchen.

HOMEOWNERS

Book a walkthrough

Tell us what the room should become. We'll tell you honestly what it takes.

ARCHITECTS

Send the set

Share your drawings for a straight tender price and early buildability notes.

Book a walkthrough 0401 772 772
LetsBuild · Lic 297590c · Sydney
page · fps