What it actually is
Structural work,
not an addition.
An extension is often described as extra space bolted onto a house.
It is not. It is footings, a roof that has to meet an existing one, drainage that
has to find a fall it did not need before, and a junction between old fabric and
new. The difficulty and the cost sit in those four things — not
in the square metres.
Licence 297590c · HIA member 1220336 · structural work · Sydney only
Three kinds
Back, side,
or up.
Which one a house can take is decided by the block, the existing
structure and the planning pathway — usually in that order.
01Rear extensions
The most common, and usually the most worthwhile. Opens the back of the house
to the garden and the northern light, and moves the living spaces to where the
sun actually is rather than where the original plan put them.
02Side & ground floor extensions
Where the block allows width. Often the answer on a wide Federation block
where going up would cost the roof line, and on corner sites where the setback
is generous on one boundary.
03Second storey additions
Bedrooms, bathrooms and a retreat upstairs without leaving the street you
chose. The roof comes off, so the house is exposed and staged weather-tight in
sequence. Existing footings and wall structure are checked by an engineer before
anything is priced.
The junction
Where old meets
new is the tell.
Every extension has a seam. You can match the original and make the
join invisible, or step away from it deliberately and let the new work read as
new. Both are defensible. Pretending there is no seam is not.
Roof lines
Ridge and gutter levels rarely align — flashings are formed, not bought
Floor levels
A step between old and new is a decision, never an accident
Brick & render
Matched face brick weathers differently — sometimes contrast ages better
Drainage
Existing gutters and downpipes may not carry the additional catchment
How it runs
Quoted straight.
Built properly.
One lead builder from first walkthrough to handover, inclusions and
exclusions on paper before a tool comes off the truck, and a stated reporting
cadence while it runs. The full sequence is set out on its own
page.
Recent work
Extensions
we've built.
Rear and second storey additions across the Eastern Suburbs, North
Shore, Northern Beaches and the Hills.
Questions
Approvals,
mostly.
The planning questions come up on every extension. Short answers
below — but the pathway is decided by your specific lot, so confirm it before
you rely on it.
Do we need council approval for an extension?
Almost always. The question is which pathway: a Development Application
assessed by council on its merits, or a Complying Development Certificate
issued under the State Environmental Planning Policy (Exempt and Complying
Development Codes) 2008 — the Codes SEPP. Which one is available depends
on the land, the zoning and the design.
What is the difference between a DA and a complying development certificate?
A DA is a merit assessment by council, with neighbour notification, and takes
as long as the assessment takes. A CDC is a combined planning and construction
approval for work that meets every standard in the Codes SEPP — because it is a
compliance check rather than a judgement, it can be determined by a council or a
registered certifier in as little as 20 days. One variation from the standards
and the project is back on the DA pathway.
Can our house use the complying development pathway?
Often not, in the suburbs we work in. Complying development is generally not
available on land containing a heritage item or listed on the State Heritage
Register, or on land within a heritage conservation area. It is also excluded on
environmentally sensitive land, land affected by coastal erosion, and foreshore
area within the foreshore building line. That covers a good deal of the Eastern
Suburbs and parts of the Northern Beaches.
How long does a rear extension take?
Four to eight months on site for most, depending on how much structure moves
and whether the roof is opened up. Approvals sit in front of that and vary by
pathway and by council.
Can we live in the house during the build?
Sometimes, for a rear extension where the existing house can be sealed off and
the kitchen and one bathroom stay in service. For a second storey addition,
usually not — the roof comes off. We tell you which it is at scope stage rather
than after the contract is signed.
Will a second storey need new footings?
Often. A new storey adds load the existing footings were not designed to
carry. Whether they need underpinning or supplementing is a structural
engineer's call from a site inspection, and sometimes a soil test. Worth
establishing early, because it changes both the program and the price.
What happens where the new roof meets the old one?
Ridge and gutter levels rarely align, flashings have to be formed rather than
bought off a shelf, and the existing gutters and downpipes may not carry the
additional catchment. It is detailed at drawing stage. Extensions that look
wrong from the street are almost always wrong at this junction.
Planning summary current at August 2026 · pathways and standards change,
and vary by council and land zoning · confirm with your council or a registered
certifier before relying on it
Start
Let's walk your house.
HOMEOWNERSBook a walkthrough
Tell us what the house should become. We'll tell you honestly what it takes.